fixture teardown
After a test is run, the test fixture that was built by the test should be destroyed. This phase of the test is called fixture teardown.
Copyright © 2003-2008 Gerard Meszaros all rights reserved
After a test is run, the test fixture that was built by the test should be destroyed. This phase of the test is called fixture teardown.
Copyright © 2003-2008 Gerard Meszaros all rights reserved